1. |
How borg warner tackles fms |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 12-13
MattLincoln,
Preview
|
PDF (1011KB)
|
|
DOI:10.1049/tpe.1984.0046
出版商:IEE
年代:1984
数据来源: IET
|
2. |
Quality circles benefit foundries |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 15-16
MichaelOxley,
Preview
|
PDF (736KB)
|
|
DOI:10.1049/tpe.1984.0047
出版商:IEE
年代:1984
数据来源: IET
|
3. |
Ships kept sailing by £½m flexible machining system |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 17-17
Preview
|
PDF (410KB)
|
|
DOI:10.1049/tpe.1984.0048
出版商:IEE
年代:1984
数据来源: IET
|
4. |
Automated assembly ripe for investment |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 20-20
Preview
|
PDF (591KB)
|
|
摘要:
At a recent IProdE conference on automated assembly, proponents of flexible assembly systems and those favouring dedicated systems both agreed that a sound case can be made for automation of this critical area.
DOI:10.1049/tpe.1984.0049
出版商:IEE
年代:1984
数据来源: IET
|
5. |
How to make MRP realty work |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 22-22
JohnGallimore,
Preview
|
PDF (476KB)
|
|
DOI:10.1049/tpe.1984.0050
出版商:IEE
年代:1984
数据来源: IET
|
6. |
How computerisation of work standards can improve industrial relations |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 23-23
Preview
|
PDF (499KB)
|
|
摘要:
According to one user of the CAPES computer aided planning and estimating system from Methods Workshop of Wigan, computerisation of work standards can eliminate many of the difficulties and arguments associated with traditional methods of gathering information standards. We look at two applications of the CAPES system.
DOI:10.1049/tpe.1984.0051
出版商:IEE
年代:1984
数据来源: IET
|
7. |
Developing your own capacity planning system |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 29-31
Preview
|
PDF (1883KB)
|
|
摘要:
Westland Helicopters has devised its own computerised capacity planning system for its gear manufacturing shop at Yeovil. Jonathan Black, graduate member, who has recently left Westland as manufacturing systems engineer, describes the new system.
DOI:10.1049/tpe.1984.0052
出版商:IEE
年代:1984
数据来源: IET
|
8. |
Computer system helps worcester cope with growth |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 32-32
Preview
|
PDF (603KB)
|
|
摘要:
We relate how this integrated and progressive adoption of a computer management system enabled a bollar manufacturer to handle new acquisitions and increasing turnover.
DOI:10.1049/tpe.1984.0053
出版商:IEE
年代:1984
数据来源: IET
|
9. |
Estimating and costing—chapter on a micro |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 34-34
Preview
|
PDF (876KB)
|
|
摘要:
Denford has adopted the MAE CAPM systems for its training and small batch production machines
DOI:10.1049/tpe.1984.0054
出版商:IEE
年代:1984
数据来源: IET
|
10. |
Production control system pays for itself in 18 months |
|
Production Engineer,
Volume 63,
Issue 3,
1984,
Page 38-38
Preview
|
PDF (744KB)
|
|
摘要:
Simply by saving two salaries, the Micross production control system from Kewill Systems of Surrey has paid for itself since being installed 18 months ago at the Harrogate works of Brammer Dynamics. We look at the system's two key modules, at the Brammer application, and at another Micross installation.
DOI:10.1049/tpe.1984.0055
出版商:IEE
年代:1984
数据来源: IET
|