1. |
A new service for members |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 437-437
Ronald G.Hooker,
Preview
|
PDF (77KB)
|
|
DOI:10.1049/tpe.1973.0086
出版商:IEE
年代:1973
数据来源: IET
|
2. |
Retirement of Frederick Walter Cooper, BSc, CEng, FIMechE, FIProdE, assistant secretary (education) |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 438-440
S.Caselton,
Preview
|
PDF (583KB)
|
|
DOI:10.1049/tpe.1973.0087
出版商:IEE
年代:1973
数据来源: IET
|
3. |
Management and the people who do the work |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 441-446
RobertAppleby,
Preview
|
PDF (1129KB)
|
|
DOI:10.1049/tpe.1973.0088
出版商:IEE
年代:1973
数据来源: IET
|
4. |
Motivation for improved quality and reliability. Part II |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 447-451
Preview
|
PDF (862KB)
|
|
DOI:10.1049/tpe.1973.0089
出版商:IEE
年代:1973
数据来源: IET
|
5. |
Professional education in the EEC |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 452-454
F.W.Cooper,
Preview
|
PDF (541KB)
|
|
DOI:10.1049/tpe.1973.0090
出版商:IEE
年代:1973
数据来源: IET
|
6. |
MTDR, ICM & IHA, 1973 |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 454-456
P.FJones,
Preview
|
PDF (913KB)
|
|
DOI:10.1049/tpe.1973.0091
出版商:IEE
年代:1973
数据来源: IET
|
7. |
Group working in mass production. Part I: Flow line work |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 457-461
RayWild,
Preview
|
PDF (874KB)
|
|
DOI:10.1049/tpe.1973.0092
出版商:IEE
年代:1973
数据来源: IET
|
8. |
Automated assembling: production data memoranda series |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 462-462
Preview
|
PDF (128KB)
|
|
DOI:10.1049/tpe.1973.0093
出版商:IEE
年代:1973
数据来源: IET
|
9. |
Computer simulation of a production system |
|
Production Engineer,
Volume 52,
Issue 12,
1973,
Page 463-466
S.K.Shrivastava,
Preview
|
PDF (495KB)
|
|
DOI:10.1049/tpe.1973.0094
出版商:IEE
年代:1973
数据来源: IET
|