1. |
New training regulations |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 421-421
Preview
|
PDF (139KB)
|
|
DOI:10.1049/tpe.1976.0124
出版商:IEE
年代:1976
数据来源: IET
|
2. |
A survey of cellular manufacturing cells |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 451-454
R.D.Pullen,
Preview
|
PDF (817KB)
|
|
DOI:10.1049/tpe.1976.0137
出版商:IEE
年代:1976
数据来源: IET
|
3. |
Devolution and its implications for scottish industry |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 455-457
JamesJack,
Preview
|
PDF (530KB)
|
|
DOI:10.1049/tpe.1976.0138
出版商:IEE
年代:1976
数据来源: IET
|
4. |
A model of industrial maintenance control |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 459-462
P.A.Tempest,
Preview
|
PDF (829KB)
|
|
摘要:
The objective of an industrial maintenance system is to minimise the ‘total’ costs of both production downtime and direct maintenance expenditure. The paper presents a model of the feedback processes and communication required to control a maintenance system. A comprehensive costing system is necessary to direct effort to those areas offering the greatest potential benefit. The extensive variety of equipment and the irregular occurrence of breakdown makes statistical analysis of problem areas both lengthy and expensive. Maintenance policy can be improved either in the form of changes to the effectiveness of the maintenance effort by adoption and subsequent control of a preventive maintenance scheme, or by establishment of procedures to enable the maintenance work load to be completed efficiently and hence improve productivity.
DOI:10.1049/tpe.1976.0139
出版商:IEE
年代:1976
数据来源: IET
|
5. |
Maintenance in theory and practice |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 463-465
D.W.Davies,
Preview
|
PDF (481KB)
|
|
摘要:
The author attempts to highlight the impact that the maintenance function may have on production effectiveness. It is his contention that it may be wise to view the production function as embracing the maintenance function. This integration should lead to a more effective operating entity. Whilst such an integration may yet be some way ahead, considerable advantages may be gained from intelligent appreciation of the impact of such factors as: maintenance organisation and status; maintenance contribution to equipment design; maintenance planning; installation and commissioning; operating and site service maintenance; and, wage payment systems.
DOI:10.1049/tpe.1976.0140
出版商:IEE
年代:1976
数据来源: IET
|
6. |
PEMEC |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 468-481
Preview
|
PDF (3449KB)
|
|
DOI:10.1049/tpe.1976.0141
出版商:IEE
年代:1976
数据来源: IET
|
7. |
SUBCON |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 482-488
Preview
|
PDF (1015KB)
|
|
DOI:10.1049/tpe.1976.0142
出版商:IEE
年代:1976
数据来源: IET
|
8. |
Coping with the ‘Wettest’ ten days of the year |
|
Production Engineer,
Volume 55,
Issue 9,
1976,
Page 491-491
JohnFenton,
Preview
|
PDF (159KB)
|
|
DOI:10.1049/tpe.1976.0143
出版商:IEE
年代:1976
数据来源: IET
|