Naval Research Logistics Quarterly


ISSN: 0028-1441        年代:1978
当前卷期:Volume 25  issue 2     [ 查看所有卷期 ]

年代:1978
 
     Volume 25  issue 1   
     Volume 25  issue 2
     Volume 25  issue 3   
     Volume 25  issue 4   
1. Determining confidence bounds for highly reliable coherent systems based on a paucity of component failures
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  213-227

Janet M. Myhre,   Andrew M. Rosenfeld,   Sam C. Saunders,  

Preview   |   PDF (608KB)

2. Approximations to the reliability of phased missions
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  229-242

Harald Ziehms,  

Preview   |   PDF (665KB)

3. Inspection policies for deteriorating equipment characterized by n quality levels
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  243-255

Z. Kander,  

Preview   |   PDF (741KB)

4. The error in the normal approximation to the multinomial with an increasing number of classes
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  257-261

Lionel Weiss,  

Preview   |   PDF (213KB)

5. A recursive algorithm for a summed multinomial density function
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  263-271

Raymond K. Fink,   Herbert Moskowitz,  

Preview   |   PDF (446KB)

6. A probability model for initial crack size and fatigue life of gun barrels
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  273-277

F. Proschan,   J. Sethuraman,  

Preview   |   PDF (198KB)

7. Multiple‐attribute decision making with partial information: The comparative hypervolume criterion
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  279-288

Johnnie R. Charnetski,   Richard M. Soland,  

Preview   |   PDF (647KB)

8. An algorithm for a class of loading problems
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  289-297

Ming S. Hung,   J. Randall Brown,  

Preview   |   PDF (486KB)

9. A heuristic network procedure for the assembly line balancing problem
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  299-307

Peter A. Pinto,   David G. Dannenbring,   Basheer M. Khumawala,  

Preview   |   PDF (417KB)

10. Pseudo‐monotonic interval programming
  Naval Research Logistics Quarterly,   Volume  25,   Issue  2,   1978,   Page  309-314

C. R. Bector,   S. K. Bhatt,  

Preview   |   PDF (252KB)

首页 上一页 下一页 尾页 第1页 共17条