1. |
The 2000 MW HVDC link between England and France |
|
Power Engineering Journal,
Volume 1,
Issue 2,
1987,
Page 69-74
F.G.Goodrich,
B.R.Andersen,
Preview
|
PDF (1477KB)
|
|
摘要:
The HVDC link across the English Channel has several innovative features. Techniques used in its construction together with recent developments have consolidated the viability of HVDC links for a variety of applications.
ISSN:1479-8344
DOI:10.1049/pe:19870011
出版商:IEE
年代:1987
数据来源: IET
|
2. |
The design of outdoor open-type EHV substations |
|
Power Engineering Journal,
Volume 1,
Issue 2,
1987,
Page 75-83
W.D.Goodwin,
A.S.Wills,
Preview
|
PDF (1794KB)
|
|
摘要:
What alternatives are available in the design of open-terminal EHV substations and what parameters affect the layout and hardware chosen?
ISSN:1479-8344
DOI:10.1049/pe:19870012
出版商:IEE
年代:1987
数据来源: IET
|
3. |
Sri Lanka's Kotmale hydro project |
|
Power Engineering Journal,
Volume 1,
Issue 2,
1987,
Page 85-91
E.M.Gosschalk,
A.D.Longman,
Preview
|
PDF (1199KB)
|
|
摘要:
The Kotmale hydropower project is a major component of the massive Mahaweli Ganga development. Adverse geological conditions at the originally planned dam site necessitated a change in the dam's location, and a comprehensive account of the investigations and project design is presented here, together with details of the main features of the scheme
ISSN:1479-8344
DOI:10.1049/pe:19870013
出版商:IEE
年代:1987
数据来源: IET
|
4. |
Power-system planning under uncertainty—a new approach |
|
Power Engineering Journal,
Volume 1,
Issue 2,
1987,
Page 92-100
T.W.Berrie,
Preview
|
PDF (1443KB)
|
|
摘要:
Because of the long lead time between ordering equipment and commissioning, power-system planning has always catered explicitly for uncertainties. In the past, elaborate deterministic techniques have been used, but there are now doubts about whether the out-turn from such sophistication justifies the efforts required. Perhaps a more flexible, informal approach to both planning and uncertainty is the answer, e.g. to be able to alter course to take account of actual conditions; also, optimisation techniques might be changed. Unexpected power-system structures, reliability and loss levels, and also generation plant mixes, might well result, which are better for meeting actual requirements than those at present
ISSN:1479-8344
DOI:10.1049/pe:19870014
出版商:IEE
年代:1987
数据来源: IET
|
5. |
System response studies incorporating real plant |
|
Power Engineering Journal,
Volume 1,
Issue 2,
1987,
Page 101-107
D.K.S.Fraser,
H.Davie,
M.W.S.MacAuley,
P.M.Johnson,
Preview
|
PDF (1396KB)
|
|
摘要:
A power-system simulator has been developed which can be attached to a real hydro-generator, making it possible to test the response of the hydro-generator with its associated governor, while apparently operating in any desired powersystem configuration
ISSN:1479-8344
DOI:10.1049/pe:19870015
出版商:IEE
年代:1987
数据来源: IET
|
6. |
The versatility of high-voltage fuses in the protection of distribution systems |
|
Power Engineering Journal,
Volume 1,
Issue 2,
1987,
Page 109-115
J.Feenan,
Preview
|
PDF (1133KB)
|
|
摘要:
Despite the challenges from other circuit-breaking devices, the high-voltage fuse is still a very important part of the protective scheme for HV distribution systems
ISSN:1479-8344
DOI:10.1049/pe:19870016
出版商:IEE
年代:1987
数据来源: IET
|
|