|
1. |
Automated testing of power system protection relays |
|
Power Engineering Journal,
Volume 2,
Issue 6,
1988,
Page 291-296
Andrew C.Webb,
MichaelWebb,
Preview
|
PDF (1101KB)
|
|
摘要:
Regular testing of protection relays is vital to maintain the integrity of electrical power transmission and distribution systems. Until recently, such testing was time consuming and required a high level of engineering skill. New developments in automatic relay test sets allow more efficient deployment of skilled personnel and permit more frequent testing which will lead to an overall improvement in power-system operational reliability
ISSN:1479-8344
DOI:10.1049/pe:19880057
出版商:IEE
年代:1988
数据来源: IET
|
2. |
High technology in a new power system to Broken Hill Mines |
|
Power Engineering Journal,
Volume 2,
Issue 6,
1988,
Page 305-313
S.K.Lowe,
M.E.K.Holden,
J.M.Lucas,
R.P.Ellen,
Preview
|
PDF (1483KB)
|
|
摘要:
A new multi-million-dollar high-voltage power-supply system involving the longest radial line in Australia, with two back-to-back DC links, several very-fast-acting dynamic voltage-control devices, employing state-of-the-art electronics and high-power thyristor technology, plus a multiplicity of modern high-voltage substation plant and equipment, has been planned, designed and progressively installed to supply essential power to the remote Australian primary industry at the lead/zinc/silver mines at Broken Hill
ISSN:1479-8344
DOI:10.1049/pe:19880066
出版商:IEE
年代:1988
数据来源: IET
|
3. |
Electrical machines and electromagnetics—computer aids to design |
|
Power Engineering Journal,
Volume 2,
Issue 6,
1988,
Page 315-321
A.B.J.Reece,
Preview
|
PDF (1143KB)
|
|
摘要:
Electrical machines play an important part in the lives of all of us: in power generation, in transport, in industry and in our homes. They are very much taken for granted, yet there have been many interesting developments and innovations, which have led, for example, to great increases in power per unit volume, reduced cost, improved efficiency and reliability and greater controllability. This article discusses some examples, draws attention to the technologies which have contributed to the developments, and shows the importance of an improved knowledge of electromagnetics. In addition, some of the many developments in computer aids to electromagnetic design will be described
ISSN:1479-8344
DOI:10.1049/pe:19880067
出版商:IEE
年代:1988
数据来源: IET
|
4. |
Plant-life extension—remanent-life assessment of high-temperature components |
|
Power Engineering Journal,
Volume 2,
Issue 6,
1988,
Page 323-331
D.J.Gooch,
Preview
|
PDF (1724KB)
|
|
摘要:
The CEGB high-merit 500MW coal-fired units were originally designed for an operating life of 150000 hours. Many of these units have now exceeded 100000 hours operation, and it has been decided to pursue a policy of life extension in order to obtain lives in excess of 250000 hours. This is a far cheaper option than building new stations which may only have marginally better thermal efficiencies
ISSN:1479-8344
DOI:10.1049/pe:19880068
出版商:IEE
年代:1988
数据来源: IET
|
5. |
Electricity distribution systems in urban areas |
|
Power Engineering Journal,
Volume 2,
Issue 6,
1988,
Page 332-336
G.Dennis,
Preview
|
PDF (809KB)
|
|
摘要:
The first public electricity supply was introduced in England in a small town called Godalming in 1881. The generator with an output of 7 kW was powered from a waterwheel. By 1889 London had its first major power station at Deptford with a capacity of 2×600kW. Since the station was some 7 miles from the city centre, a transmission circuit operating at 10kV had to be laid
ISSN:1479-8344
DOI:10.1049/pe:19880069
出版商:IEE
年代:1988
数据来源: IET
|
6. |
Overseas activities and co-operation |
|
Power Engineering Journal,
Volume 2,
Issue 6,
1988,
Page 337-339
A.J.Havelock,
A.Howarth,
Preview
|
PDF (542KB)
|
|
摘要:
Through British Electricity International (BEI) the experience and expertise of the British electricity boards, including the Central Electricity Generating Board (CEGB), which together make up one of the largest fully interconnected electricity utilities in the world, are made available to overseas utilities. The experience and expertise within the boards has been obtained over the years by actually developing and operating the advanced, integrated, high-technology system
ISSN:1479-8344
DOI:10.1049/pe:19880070
出版商:IEE
年代:1988
数据来源: IET
|
|