The Engineering Economist


ISSN: 0013-791X        年代:1977
当前卷期:Volume 23  issue 4     [ 查看所有卷期 ]

年代:1977
 
     Volume 22  issue 2   
     Volume 22  issue 3   
     Volume 22  issue 4   
     Volume 23  issue 1   
     Volume 23  issue 2   
     Volume 23  issue 3   
     Volume 23  issue 4
1. Capital Budgeting Decision Rules for Risky Projects Derived from a Capital Market Model Based on Semivariance
  The Engineering Economist,   Volume  23,   Issue  4,   1977,   Page  211-222

ColinG. Hoskins,  

Preview   |   PDF (198KB)

2. Estimating Facility Size for Variable or Uncertain Activity Levels
  The Engineering Economist,   Volume  23,   Issue  4,   1977,   Page  223-230

RaymondE. Willis,  

Preview   |   PDF (109KB)

3. Discriminant Analysis and Local Rejection of Corps Reservoir Recreation Projects
  The Engineering Economist,   Volume  23,   Issue  4,   1977,   Page  231-247

JamesC. Loughlin,   Ki-Tai Pae,  

Preview   |   PDF (252KB)

4. Devices for Electric Utility Rate Design Under Transition Towards Time of Use Marginal Cost Pricing
  The Engineering Economist,   Volume  23,   Issue  4,   1977,   Page  249-263

RichardW. Bossert,  

Preview   |   PDF (247KB)

5. RECONCILING OF ENGINEERING ECONOMY FEASIBILITY STUDIES WITH CORPORATE GOALS
  The Engineering Economist,   Volume  23,   Issue  4,   1977,   Page  265-274

RaymondP. Lutz,  

Preview   |   PDF (161KB)

首页 上一页 下一页 尾页 第1页 共5条