1. |
A GENERAL PROCEDURE FOR INCORPORATING ASSET UTILIZATION DECISIONS INTO REPLACEMENT ANALYSIS |
|
The Engineering Economist,
Volume 44,
Issue 3,
1999,
Page 217-238
JOSEPHC. HARTMAN,
Preview
|
PDF (729KB)
|
|
摘要:
Replacement analysis has generally been treated as a tactical decision. However, the economic life of an asset is dependent on its utilization, which is an operational decision. Traditional replacement models assume fixed levels of asset utilization to. determine minimum cost replacement schedules, preventing analysis of different utilization/replacement scenarios that may lead to lower overall cost solutions. This problem arises when a multitude of assets may be utilized to achieve a required service level. A model is presented that simultaneously determines tactical (replacement) and operational (utilization) decisions in a general and flexible manner.
ISSN:0013-791X
DOI:10.1080/00137919908967521
出版商:Taylor & Francis Group
年代:1999
数据来源: Taylor
|
2. |
A QUALITY FUNCTION DEPLOYMENT APPROACH TO STRATEGIC CAPITAL BUDGETING |
|
The Engineering Economist,
Volume 44,
Issue 3,
1999,
Page 239-260
FARIBORZY. PARTOVI,
Preview
|
PDF (756KB)
|
|
摘要:
This paper presents a new analytic method of capital budgeting that takes into account both customer “wants” and competitor's status (or relative position and strength. The model, which is loosely based on quality function deployment (QFD), incorporates market segments, customer “wants,” design specifications, various manufacturing processes, and capital budgeting projects as rows and columns of interconnected QFD matrices. In addition, we have used the analytic hierarchy process (AHP) to determine the intensity of the relationship between the variables involved in each matrix of the model. Ultimately, the goal of these matrices is to prioritize projects and ensure that the projects funded are focused on satisfying customer “wants.” Project priorities calculated from the interconnected matrices are used as the objective function in a 0–1 integer program to determine funding allocation levels for various capital budgeting projects. A practical example shows the applicability of the model to manufacturing organizations.
ISSN:0013-791X
DOI:10.1080/00137919908967522
出版商:Taylor & Francis Group
年代:1999
数据来源: Taylor
|
3. |
AN EFFICIENT APPROACH TO PRIORITIZE PROJECTS UNDER BUDGET CONSTRAINTS |
|
The Engineering Economist,
Volume 44,
Issue 3,
1999,
Page 261-275
CHIU-CHI WEI,
CHIE-BEIN CHEN,
CHIH-HUNG TSAI,
Preview
|
PDF (445KB)
|
|
摘要:
This paper proposes a new heuristic algorithm for solving the project selection problem. A revised decision criterion in conjunction with the techniques of searching the feasible range and the reduced candidate set is applied to improve the heuristic solution and to minimize the computational efforts. Six hard cases are tested using the presented algorithm and two other methods. Results show that the approach used in this study excels previous works in producing a small feasible range and in dealing with the abnormal data set.
ISSN:0013-791X
DOI:10.1080/00137919908967523
出版商:Taylor & Francis Group
年代:1999
数据来源: Taylor
|
4. |
DERIVATION OF AN INTERTEMPORAL CORRELATION COEFFICIENT MODEL BASED ON CASH FLOW COMPONENTS AND PROBABILISTIC EVALUATION OF A PROJECT'S NPV |
|
The Engineering Economist,
Volume 44,
Issue 3,
1999,
Page 276-294
SANG-HOON KIM,
HUSSEINH. ELSAID,
DAVIDJ. KIM,
Preview
|
PDF (544KB)
|
|
摘要:
If the first two moments (mean and variance) of the net present value (NPV) are known, various probabilistic information of possible NPV can be derived. However, in general, it is practically impossible to estimate the variance of lengthy investment projects due to difficulties in estimating all the intertemporal correlation coefficients between cash flows of two different periods. In this paper, we derive an estimation model for the intertemporal coefficients based on cash flow components and show how the model, under a certain assumption, can be used for estimating and deriving probabilistic information.
ISSN:0013-791X
DOI:10.1080/00137919908967524
出版商:Taylor & Francis Group
年代:1999
数据来源: Taylor
|
5. |
CONSTITUTION AND BYLAWS |
|
The Engineering Economist,
Volume 44,
Issue 3,
1999,
Page 295-301
Preview
|
PDF (197KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137919908967525
出版商:Taylor & Francis Group
年代:1999
数据来源: Taylor
|
|