Plant/Operations Progress


ISSN: 0278-4513        年代:1983
当前卷期:Volume 2  issue 3     [ 查看所有卷期 ]

年代:1983
 
     Volume 2  issue 1   
     Volume 2  issue 2   
     Volume 2  issue 3
     Volume 2  issue 4   
1. Plant/Operations Shorts …
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  2-3

Preview   |   PDF (381KB)

2. Sudden pressure increase in a vent header. A case‐history involving nickel plating due to the deposition of metallic nickel from nickel‐carbonyl vapor
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  137-140

J. M. Blanken,   Th. Groefsema,  

Preview   |   PDF (1329KB)

3. New concepts in the classification of class II hazardous locations. The classification of Class II hazardous locations is in urgent need of reworking prior to publication of the upcoming 1984 code
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  140-143

R. Y. Le Vine,  

Preview   |   PDF (869KB)

4. An opportunity: Less than design rate operations
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  144-146

Howard W. Martin,  

Preview   |   PDF (329KB)

5. Industrial hygiene evaluations for control design. Control of ambient toxic concentrations goes beyond the exhaust‐ventilation concept to become an integral part of process design and operation
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  146-149

Howard L. Kusnetz,   Carolyn F. Phillips,  

Preview   |   PDF (472KB)

6. Safe burning of explosive offgas. Based on operating experience at a BASF urea plant in Germany, the potentially explosive offgas can be successfully used as a fuel
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  150-153

Dietrich Lützow,   Gerd Hemmer,  

Preview   |   PDF (411KB)

7. Corrosion of a CO2‐absorber tower wall. It is demonstrated by industrial experience that a situation involving inadequate wetting can exist for years before it suddenly results in dangerous corrosion
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  153-160

W. D. Verduijn,  

Preview   |   PDF (1823KB)

8. Engineering information system for a demonstration plant facility. A newly developed system has, within the first year, led to operating savings well in excess of the cost of the complete system
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  160-164

L. W. Bonnell,   E. C. Heydorn,   J. R. Couch,  

Preview   |   PDF (821KB)

9. Tank‐car loading station for liquid and aqueous ammonia. A detailed description of the functions and safeguards of a modern, computer‐controlled rail‐car loading station for liquid and aqueous ammonia
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  165-167

Gottfried Schlichthärle,   Theo Huberich,  

Preview   |   PDF (797KB)

10. Chain reaction power system failure in a fertilizer complex. A detailed case‐history account of a power‐system failure and a discussion of the safeguards installed to prevent a repetition
  Plant/Operations Progress,   Volume  2,   Issue  3,   1983,   Page  168-173

Diter Cohn,  

Preview   |   PDF (2102KB)

首页 上一页 下一页 尾页 第1页 共18条