|
1. |
Estimating methods |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 601-614
R.Litster,
R.Moore,
Preview
|
PDF (1052KB)
|
|
DOI:10.1049/jipe.1934.0067
出版商:IProdE
年代:1934
数据来源: IET
|
2. |
Estimating methods |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 615-634
L.E.Bunnett,
Preview
|
PDF (1452KB)
|
|
DOI:10.1049/jipe.1934.0068
出版商:IProdE
年代:1934
数据来源: IET
|
3. |
Estimating |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 635-639
A.Perry-Keene,
Preview
|
PDF (322KB)
|
|
DOI:10.1049/jipe.1934.0069
出版商:IProdE
年代:1934
数据来源: IET
|
4. |
Estimating methods applied to production engineering |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 640-645
F.T.Nurrish,
R.J.Mitchell,
Preview
|
PDF (429KB)
|
|
DOI:10.1049/jipe.1934.0070
出版商:IProdE
年代:1934
数据来源: IET
|
5. |
Estimating methods |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 646-656
JamesWright,
J.Maxwell,
Preview
|
PDF (811KB)
|
|
DOI:10.1049/jipe.1934.0071
出版商:IProdE
年代:1934
数据来源: IET
|
6. |
Estimating methods |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 657-661
J.W.Griffiths,
Preview
|
PDF (379KB)
|
|
DOI:10.1049/jipe.1934.0072
出版商:IProdE
年代:1934
数据来源: IET
|
7. |
Estimating methods |
|
Journal of the Institution of Production Engineers,
Volume 13,
Issue 12,
1934,
Page 662-678
J.A.Lacey,
Preview
|
PDF (833KB)
|
|
DOI:10.1049/jipe.1934.0073
出版商:IProdE
年代:1934
数据来源: IET
|
|