IIE Transactions


ISSN: 0740-817X        年代:1998
当前卷期:Volume 30  issue 1     [ 查看所有卷期 ]

年代:1998
 
     Volume 30  issue 1
     Volume 30  issue 2   
     Volume 30  issue 3   
     Volume 30  issue 4   
     Volume 30  issue 5   
     Volume 30  issue 6   
     Volume 30  issue 7   
     Volume 30  issue 8   
     Volume 30  issue 9   
     Volume 30  issue 10   
     Volume 30  issue 11   
     Volume 30  issue 12   
1. A formalism to structure and parallelize the integration of cooperative engineering design tasks
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  1-15

NITIN KHANNA,   JOSEA.B. FORTES,   SHIMONY. NOF,  

Preview   |   PDF (2050KB)

2. Robust design of assembly and machining tolerance allocations
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  17-29

CHUN (CHUCK)ZHANG,   HSU-PIN (BEN)WANG,  

Preview   |   PDF (1447KB)

3. Base-stock control for single-product tandem make-to-stock systems
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  31-39

IZAK DUENYAS,   PRAYOON PATANA-ANAKE,  

Preview   |   PDF (1171KB)

4. Performance analysis of assembly/disassembly systems with unreliable machines and random processing times
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  41-53

KEUN-CHAE JEONG,   YEONG-DAE KIM,  

Preview   |   PDF (1382KB)

5. Buffering unbalanced assembly systems
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  55-65

STEPHENG. POWELL,   DAVIDF. PYKE,  

Preview   |   PDF (1358KB)

6. The impact of sorting strategies on automated sortation system performance
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  67-77

M. ERIC JOHNSON,  

Preview   |   PDF (1353KB)

7. Cut order planning for apparel manufacturing
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  79-90

CHARLOTTE JACOBS-BLECHA,   JANEC. AMMONS,   AVRIL SCHUTTE,   TERRI SMITH,  

Preview   |   PDF (1318KB)

8. Project scheduling algorithms for re-layout projects
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  91-99

THOMASA. LACKSONEN,   CHAO-YEN HUNG,  

Preview   |   PDF (887KB)

9. The equivalence of two-station closed and open serial production systems with finite buffers
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  101-106

DAVIDS. KIM,  

Preview   |   PDF (630KB)

10. Review of:“Cellular Manufacturing Systems: Design, Planning and control” Nanua Singh and Divakar Rajamani Chapman & Hall, 1996, 277 pp., $78·00, ISBN 0-412-55710-X
  IIE Transactions,   Volume  30,   Issue  1,   1998,   Page  107-107

BhabaR. Sarker,  

Preview   |   PDF (145KB)

首页 上一页 下一页 尾页 第1页 共10条