1. |
Scheduling a two-machine flowshop with travel times to minimize maximum lateness |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 1-15
J. W. Stevens,
D.D. Gemmill,
Preview
|
PDF (178KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497195948
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
2. |
Design and utilization of a fuzzy knowledge-based system for design feature recognition of freehand illustrations |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 17-27
N. Maki,
T. Tabe,
G. Salvendy,
Preview
|
PDF (218KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497195957
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
3. |
Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 29-49
U. Wemmerlov,
D. J. Johnson,
Preview
|
PDF (231KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497195966
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
4. |
An improved Taguchi's method in design of experiments for milling CFRP composite |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 51-66
P. Y. Chao,
Y.D. Hwang,
Preview
|
PDF (211KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497195975
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
5. |
An evaluation of capacity planning techniques in a remanufacturing environment |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 67-82
V. D.R. Guide,
R. Srivastava,
M.S. Spencer,
Preview
|
PDF (198KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497195984
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
6. |
Performance evaluation in production flow analysis |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 83-99
R. De Guio,
M. Barth,
Preview
|
PDF (211KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497195993
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
7. |
Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2 |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 101-122
B. Sharadapriyadarshini,
C. Rajendran,
Preview
|
PDF (287KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497196000
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
8. |
Alternative manufacturing sequences and tolerance buildup: A point of view and a case study |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 123-136
Y. Fathi,
R.O. Mittal,
J.E. Cline,
P.M. Martin,
Preview
|
PDF (183KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497196019
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
9. |
Utilizing simulation to develop economic equipment selection and sampling plans for integrated circuit manufacturing |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 137-155
S. A. Delurgio,
S.T. Foster,
G. Dickerson,
Preview
|
PDF (207KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497196028
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|
10. |
Design for agile assembly: An operational perspective |
|
International Journal of Production Research,
Volume 35,
Issue 1,
1997,
Page 157-178
A. Kusiak,
D.W. He,
Preview
|
PDF (265KB)
|
|
ISSN:0020-7543
DOI:10.1080/002075497196037
出版商:Taylor & Francis Group
年代:1997
数据来源: Taylor
|