|
1. |
A Cost Evaluation Model for Radiology Departments |
|
The Engineering Economist,
Volume 20,
Issue 2,
1975,
Page 79-98
WilliamG. Sullivan,
GeraldJ. Thuesen,
Preview
|
PDF (969KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917508965136
出版商:Taylor & Francis Group
年代:1975
数据来源: Taylor
|
2. |
Incorporating Risk Aversion into Risk Analysis |
|
The Engineering Economist,
Volume 20,
Issue 2,
1975,
Page 99-122
RobertH. Hayes,
Preview
|
PDF (1398KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917508965137
出版商:Taylor & Francis Group
年代:1975
数据来源: Taylor
|
3. |
Sensitivity Analysis of the Present Value of a Project |
|
The Engineering Economist,
Volume 20,
Issue 2,
1975,
Page 123-150
HenriL. Beenhakker,
Preview
|
PDF (1229KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917508965138
出版商:Taylor & Francis Group
年代:1975
数据来源: Taylor
|
4. |
The “Estimation Bias” in the Measurement of Cost Curves |
|
The Engineering Economist,
Volume 20,
Issue 2,
1975,
Page 151-156
Joseph Kushner,
Preview
|
PDF (292KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917508965139
出版商:Taylor & Francis Group
年代:1975
数据来源: Taylor
|
|