1. |
An Optimal Strategy for Capacity Expansion |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 79-98
Juan Carlos Berretta,
Fereidoun Mobasheri,
Preview
|
PDF (203KB)
|
|
摘要:
A mathematical model is developed for determining the optimal sequence of expansions for a processing industry. The demand for the output is increasing over time at a geometric rate. The economic objective is minimization of the present worth of the total system cost to meet this growing demand. The cost includes the expenditure for development and operation of local plants and the cost of importing products when the supply from these plants is not adequate to meet the demand.
ISSN:0013-791X
DOI:10.1080/00137917208902703
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
2. |
A Case Study of the Application of Cost Benefit Analysis to Water System Consolidation by Local Government |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 99-114
Marvin R. Brams,
Preview
|
PDF (234KB)
|
|
摘要:
Cost-benefit analysis and engineering analysis were used to help New Castle County, Delaware, decide if it should acquire the major private water companies which serve the northern part of the county and then enter into a joint operation with the major municipal systems in order to achieve a unified, countywide water system. The present value of the quantifiable benefits resulting from unification are computed using alternative discount rates and time periods. These present values are compared to alternative costs of purchasing the private water companies on the basis of their capitalized earnings, original cost, replacement cost and fair value. In those instances where B/C > 1, the county could justify unification on the basis of its own benefits and costs subject to the caveat that many specified benefits and costs could not be quantified. Benefit-cost analysis provides a certain perspective, but it alone cannot decide the question of unification through public ownership.
ISSN:0013-791X
DOI:10.1080/00137917208902704
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
3. |
Analog Solution of Econometric Models |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 115-133
Hamid Habibagahi,
Lawrence R. Klein,
Preview
|
PDF (218KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902705
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
4. |
Teaching Engineering Economy in Continuing Education |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 134-136
Robley Winfrey,
Preview
|
PDF (37KB)
|
|
摘要:
The following is an excerpt from a paper presented at the 79th Annual Conference, American Society for Engineering Education, at Annapolis, Maryland in June 1971. These thoughts seem appropriate considering today's renewed concern with the long-range economic impact of capital expenditures. Raymond P. Lutz Associate Editor
ISSN:0013-791X
DOI:10.1080/00137917208902706
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
5. |
COMMENT ON: “LAPLACE TRANSFORMS FOR THE ECONOMIC ANALYSIS OF DETERMINISTIC PROBLEMS IN ENGINEERING” by James R. Buck and Thomas W. Hill, Jr.(Volume 16-NO.4 ) |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 137-138
José L. López Léautaud,
Preview
|
PDF (36KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902707
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
6. |
A Review of: “PRINCIPLES OF OPERATIONS RESEARCH WITH APPLICATIONS TO MANAGERIAL DECISIONS” by Harvey Wagner Prentice-Hall, Inc. 1969 $14.95 1084pp |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 139-140
RogerW. Berger,
Preview
|
PDF (33KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902708
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
7. |
A Review of: “TECHNIQUES FOR PROJECT APPRAISAL UNDER UNCERTAINTY” by Shlomo Reutlinger World Bank Staff Occasional Papers - Number Ten Distributed by The Johns Hopkins Press 1970 95 pp $3.00 |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 141-142
FranklinK. Wolf,
Preview
|
PDF (123KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902709
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
8. |
A Review of: ADVANCED TECHNIQUES FOR STRATEGIC PLANNING by Ernest C. Miller |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 143-145
ClarenceE. Bullinger,
Preview
|
PDF (42KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902710
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
9. |
A Review of: MANAGING THE RESOURCE ALLOCATION PROCESS: A STUDY OF CORPORATE PLANNING AND INVESTMENT by, Joseph L. Bower |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 146-146
W. L. Jenkins,
Preview
|
PDF (17KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902711
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|
10. |
20 CQ 4 U |
|
The Engineering Economist,
Volume 17,
Issue 2,
1972,
Page 147-148
GeraldW. Smith,
Preview
|
PDF (24KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137917208902712
出版商:Taylor & Francis Group
年代:1972
数据来源: Taylor
|