1. |
FUZZY CASH FLOW ANALYSIS USING PRESENT WORTH CRITERION |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 113-138
CHUI-YU CHIU,
CHANS. PARK,
Preview
|
PDF (391KB)
|
|
摘要:
In practice, engineering economic analysis involves uncertainty about future cash flows. To deal quantitatively with imprecision or uncertainty, fuzzy set theory is primarily concerned with vagueness in human thoughts and perceptions. As an alternative to conventional cash flow models where cash flows are defined as either crisp numbers or risky probability distributions, we propose an engineering economic decision model in which the uncertain cash flows and discount rates are specified as triangular fuzzy numbers. The present worth formulation of this fuzzy cash flow model is derived. The result of the present worth is also a fuzzy number with nonlinear membership function. The present worth can be approximated by a triangular fuzzy number. Deviation between exact present worth and its approximate form is examined. Finally, the fuzzy project selection is performed by applying different dominance rules. To demonstrate the application of the fuzzy present worth function, a comprehensive numerical example is presented.
ISSN:0013-791X
DOI:10.1080/00137919408903117
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
2. |
OVERALL RATES OF RETURN: INVESTMENT BASES, REINVESTMENT RATES AND TIME HORIZONS |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 139-163
DAVIDM. SHULL,
Preview
|
PDF (459KB)
|
|
摘要:
This paper compares and contrasts several previously proposed rate of return capital budgeting methodologies. It focuses on recently proposed overall rate of return methods that provide NPV-consisient project evaluations. The examination is undertaken by introducing a conceptual framework to characterize rate of return methods along the following three parameters: (1) the investment base, (2) the reinvestment rate, and (3) the lime horizon over which projects are evaluated. This parametric framework highlights differences among alternative rate of return methods so that they can be easily compared and contrasted. Additionally, the examination suggests appropriate potential applications for the alternative methodologies.
ISSN:0013-791X
DOI:10.1080/00137919408903118
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
3. |
COMPUTER RATE OF RETURN ANALYSIS OF MIXED CAPITAL PROJECTS |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 165-176
T. L. WARD,
Preview
|
PDF (203KB)
|
|
摘要:
Computer codes for the routine implementation of tbe Teichroew-Robicheck-Montalbano (TRM) rate-of-return formulation are presented. Project cash flow sequences are classified as one of the four TRM cases and then analyzed. Project investment rates (PIR) are calculated for user specified minimum attractive rates of return.
ISSN:0013-791X
DOI:10.1080/00137919408903119
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
4. |
GENERALIZED FORMULA FOR THE PERIODIC GEOMETRIC-GRADIENT SERIES PAYMENT IN A SKIP PAYMENT LOAN WITH ARBITRARY SKIPS |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 177-185
ILKYEONG MOON,
Preview
|
PDF (116KB)
|
|
摘要:
Recently, Formato derived a useful formula of the amount of periodic equal payment in a skip payment loan with arbitrary skips using a second-order finite difference equation. We rederive his formula using simple arithmetics and provide an intuitive explanation of the formula. We also extend his result to the case that periodic payments occur in a geometric-gradient-series.
ISSN:0013-791X
DOI:10.1080/00137919408903120
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
5. |
THE WEIGHTED AVERAGE COST OF CAPITAL AND SEQUENTIAL MARGINAL COSTING: A CLARIFICATION |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 187-192
LOUEK. WANG,
Preview
|
PDF (205KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137919408903121
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
6. |
“FACTS” AREN'T ALWAYS WHAT THEY SEEM |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 193-196
JEROMEP. LAVELLE,
Preview
|
PDF (55KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137919408903122
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
7. |
CONCURRENT ENGINEERING: CONTEMPORARY ISSUES AND MODERN DESIGN TOOLS EDITED BY HAMID R. PARSAEJ AND WILLIAM G. SULLIVAN Chapman & Hall, London, 1993, xiii + 497 pp. ISBN 0-412-46510-8. List: $75.00. |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 197-199
RashpalS. Ahluwalia,
Preview
|
PDF (377KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137919408903123
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
8. |
CONTEMPORARY ENGINEERING ECONOMICS CASE STUDIES BY CHAN S.PARK Addison-Wesley Publishing Company, Reading Massachusetts, 1993, viii + 98 pp. + 31 page appendix of interest tables. ISBN 0-201-53277-8. List: $19.95. |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 199-201
DavidG. Humphrey,
Preview
|
PDF (248KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137919408945391
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|
9. |
STRATEGIES FOR INNOVATION BY WILLI AM B. ROUSE Wiley-Interscience, John Wiley and Sons, Inc., New York, 1992, xiv + 249 pp. ISBN 0-471-55904-0. List: $54.95. |
|
The Engineering Economist,
Volume 39,
Issue 2,
1994,
Page 201-203
WilliamA. Smith,
Preview
|
PDF (52KB)
|
|
ISSN:0013-791X
DOI:10.1080/00137919408945392
出版商:Taylor & Francis Group
年代:1994
数据来源: Taylor
|