The Engineering Economist


ISSN: 0013-791X        年代:1982
当前卷期:Volume 28  issue 1     [ 查看所有卷期 ]

年代:1982
 
     Volume 28  issue 1
     Volume 28  issue 2   
1. A Comparative Analysis of the Accelerated Cost Recovery System as Enacted by the 1981 Economic Recovery Tax Act
  The Engineering Economist,   Volume  28,   Issue  1,   1982,   Page  1-30

LelandT. Blank,   DonaldR. Smith,  

Preview   |   PDF (764KB)

2. Present Value Analysis, Inflation, and Capital Recovery Factors
  The Engineering Economist,   Volume  28,   Issue  1,   1982,   Page  31-52

RodneyL. LeRoy,   DavidJ. Fowler,  

Preview   |   PDF (521KB)

3. The Economics of Cogeneration at Large Central Power Plants “Case Study”
  The Engineering Economist,   Volume  28,   Issue  1,   1982,   Page  53-69

E. W. Browning,   D. E. Briggs,  

Preview   |   PDF (431KB)

4. A COMPUTER PROGRAM FOR CALCULATING PERCENT SURVIVING FROM FREQUENCY OF RETIREMENT CURVES
  The Engineering Economist,   Volume  28,   Issue  1,   1982,   Page  70-83

DavidJ. Berquist,  

Preview   |   PDF (311KB)

5. COMMENT ON “PRESENT WORTH ANALYSIS OF DETERMINISTIC PERIODIC CASH FLOWS”
  The Engineering Economist,   Volume  28,   Issue  1,   1982,   Page  84-87

Dean Layman,   Gene Foster,  

Preview   |   PDF (79KB)

首页 上一页 下一页 尾页 第1页 共5条