1. |
Accident investigation: How far should we go? |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 1-3
Trevor A. Kletz,
Preview
|
PDF (379KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030103
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
2. |
Plant/operations shorts … |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 2-5
Preview
|
PDF (229KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030102
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
3. |
High pressure codes and standards |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 3-7
Charles B. Boyer,
Preview
|
PDF (605KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030104
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
4. |
Scale‐up for safety relief of runaway reactions |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 7-11
Hans K. Fauske,
Preview
|
PDF (656KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030105
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
5. |
Shutdown winterization of a 1500 ton per day ammonia plant |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 12-13
James R. Facer,
Richard W. Rich,
Preview
|
PDF (282KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030106
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
6. |
Ammonia process simulator |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 14-17
S. Madhavan,
Preview
|
PDF (1178KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030107
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
7. |
Learning value from recent loss |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 18-18
Thomas O. Gibson,
Preview
|
PDF (132KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030108
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
8. |
The prevention of major leaks—better inspection after construction? |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 19-24
Trevor A. Kletz,
Preview
|
PDF (730KB)
|
|
摘要:
Abstract“On the 26th September (1850) we were able to fix the first column in its place. From this time I took the general management of the building under my charge, and spent my time on the works–feeling that, unless the same person who made the drawings was always present to assign each part to its proper place in the structure, it would have been impossible to finish the building in time for the opening on the 1st of May.”Charles Fox, builder of the Crystal Palace, quoted by L. T. C. Rolt in “Victorian Engineering,” Penguin Books, 197
ISSN:0278-4513
DOI:10.1002/prsb.720030109
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
9. |
Failure analysis of ammonia plant shutdown instrumentation and control |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 25-28
John Prijatel,
Preview
|
PDF (373KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030110
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|
10. |
Sewers can pass on problems |
|
Plant/Operations Progress,
Volume 3,
Issue 1,
1984,
Page 29-31
J. Easterbrook,
D. V. Gagliardi,
Preview
|
PDF (297KB)
|
|
ISSN:0278-4513
DOI:10.1002/prsb.720030111
出版商:American Institute of Chemical Engineers
年代:1984
数据来源: WILEY
|