1. |
Production control by “stepped” progress charts |
|
Journal of the Institution of Production Engineers,
Volume 18,
Issue 3-4,
1939,
Page 83-93
I.R.Ernst Hijmans,
Preview
|
PDF (1421KB)
|
|
DOI:10.1049/jipe.1939.0009
出版商:IProdE
年代:1939
数据来源: IET
|
2. |
Die-casting |
|
Journal of the Institution of Production Engineers,
Volume 18,
Issue 3-4,
1939,
Page 113-124
ArthurStreet,
Preview
|
PDF (866KB)
|
|
DOI:10.1049/jipe.1939.0013
出版商:IProdE
年代:1939
数据来源: IET
|
3. |
The armorial bearings of the Institution |
|
Journal of the Institution of Production Engineers,
Volume 18,
Issue 3-4,
1939,
Page 129-131
Preview
|
PDF (230KB)
|
|
DOI:10.1049/jipe.1939.0015
出版商:IProdE
年代:1939
数据来源: IET
|
4. |
How to keep overheads within bounds |
|
Journal of the Institution of Production Engineers,
Volume 18,
Issue 3-4,
1939,
Page 132-145
F.Theodorson,
Preview
|
PDF (1116KB)
|
|
DOI:10.1049/jipe.1939.0016
出版商:IProdE
年代:1939
数据来源: IET
|
5. |
Spot welding |
|
Journal of the Institution of Production Engineers,
Volume 18,
Issue 3-4,
1939,
Page 151-174
C.W.Leng,
Preview
|
PDF (1575KB)
|
|
DOI:10.1049/jipe.1939.0018
出版商:IProdE
年代:1939
数据来源: IET
|