首页   按字顺浏览 期刊浏览 卷期浏览 Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing op...
Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types

 

作者: B. Sharadapriyada Rshini,   C. Rajend Ran,  

 

期刊: International Journal of Production Research  (Taylor Available online 1997)
卷期: Volume 35, issue 11  

页码: 3133-3156

 

ISSN:0020-7543

 

年代: 1997

 

DOI:10.1080/002075497194327

 

出版商: Taylor & Francis Group

 

数据来源: Taylor

 

 

点击下载:  PDF (247KB)



返 回