The CEBAF experimental equipment
作者:
John Domingo,
Roger Carlini,
Bernhard Mecking,
Jean Mougey,
期刊:
AIP Conference Proceedings
(AIP Available online 1992)
卷期:
Volume 269,
issue 1
页码: 25-79
ISSN:0094-243X
年代: 1992
DOI:10.1063/1.42980
出版商: AIP
数据来源: AIP
摘要:
This paper reviews the status of the CEBAF experimental equipment as of the summer of 1992. At that time, the initial complement of experimental equipment had largely been defined, the major components were under contract, and the carriage for the HMS was being installed in the Hall C end station.If funding continues as expected, the first experiments will begin in Hall C in the Spring of 1994, with the startup of Halls A and B about a year later. It is hoped that the overview presented here will serve as a useful general reference for users and other interested scientists.This paper is divided into three parts which separately describe the status of the three Halls. Each part contains its own introduction, a desciption of the equipment currently being designed or built, and some discussion of instrumentation. For an introduction and overview of the Physics, please see contribution by J. D. Walecka later in this Proceedings. A brief discussion of some of the physics planned for Halls B and C is also included here. Also included in Part 3 is a brief summary of the schedule for Hall C, the first to start experiments.
点击下载:
PDF
(3635KB)
返 回