Testing minimum performance levels for kanban-controlled lines
作者:
B. J. BERKLEY,
期刊:
International Journal of Production Research
(Taylor Available online 1994)
卷期:
Volume 32,
issue 1
页码: 93-109
ISSN:0020-7543
年代: 1994
DOI:10.1080/00207549408956918
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
The production literature has focused on the problem of setting the number of kanbans to achieve a given performance level. However, in practice, station supervisors are given the authority to set kanban numbers and the management problem is to determine the minimum performance level required of each station to obtain a desired line production rate. This paper shows how to find the minimum performance levels necessary to guarantee production rates independently of the average station processing times used.
点击下载:
PDF (499KB)
返 回