Input scheduling and load balance control for a job shop
作者:
SADAO SHTMOYASHIRO,
KENIGHJ TSODA,
HIROSHI AWANE,
期刊:
International Journal of Production Research
(Taylor Available online 1984)
卷期:
Volume 22,
issue 4
页码: 597-605
ISSN:0020-7543
年代: 1984
DOI:10.1080/00207548408942482
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
This paper deals with a method for scheduling and control of a maching job shop where the average number of operation stages per part is six and the average operation time per stage is about one hour. The method is based on the adjustment of load balance among machines and the limitation of the amount of work input. By simulation with real data, it was found that two variables, the load balance and input amount of work, definitely influence shop performances such as lateness, mean flow time and utilization of machines. If these two variables are well controlled, good results can be obtained no matter what the dispatching priority rules on the shop floor may be.
点击下载:
PDF (301KB)
返 回