A Two-product, Single-machine, Storage-constrained Production Problem
作者:
IbrahimA.,
ThomasL. C.,
期刊:
Journal of the Operational Research Society
(Taylor Available online 1991)
卷期:
Volume 42,
issue 9
页码: 785-791
ISSN:0160-5682
年代: 1991
DOI:10.1057/jors.1991.149
出版商: Taylor&Francis
关键词: Inventory;Multi-Item Production;Scheduling
数据来源: Taylor
摘要:
AbstractThis paper considers a two-product, single-machine production scheduling problem where there is an added constraint on the amount of finished stock that can be held. The need for a ratio of the cycle times of the two products is a feature both of two-product production scheduling problems contained on one machine and two-product inventory problems with constraints on storage capacity. This means an easy solution algorithm is possible for the problem addressed in the paper which has both types of constraints.
点击下载:
PDF (3203KB)
返 回