首页   按字顺浏览 期刊浏览 卷期浏览 Flexible assembly cell to be set up at longbridge
Flexible assembly cell to be set up at longbridge

 

作者:

 

期刊: Production Engineer  (IET Available online 1984)
卷期: Volume 63, issue 4  

页码: 30-30

 

年代: 1984

 

DOI:10.1049/tpe.1984.0072

 

出版商: IEE

 

数据来源: IET

 

摘要:

Money has been made available for BL Technology of Longbridge to build and run a flexible assembly system (FAS) for possible use in assembling car components. The ‘backbone’ of the FAS will be an IBM RS/1 robotic system. Rory Baxter visited the Longbridge works.

 

点击下载:  PDF (1127KB)



返 回