Scheduling in a two-stage manufacturing process
作者:
SEETUARMAL. NARASTMHAN,
SHRTKANTS. PANWALKAR,
期刊:
International Journal of Production Research
(Taylor Available online 1984)
卷期:
Volume 22,
issue 4
页码: 555-564
ISSN:0020-7543
年代: 1984
DOI:10.1080/00207548408942479
出版商: Taylor & Francis Group
数据来源: Taylor
摘要:
This paper describes an industrial scheduling problem taken from a cable manufacturing process. An heuristic solution procedure known as the CMD rule is presented for this multi-product, multistage, continuous flow problem. The solution procedure is designed to minimize the sum of idle time of machines and in-process waiting at the second stage. A comparison of this rule with some standard scheduling rules is provided.
点击下载:
PDF (305KB)
返 回