首页   按字顺浏览 期刊浏览 卷期浏览 Production control system pays for itself in 18 months
Production control system pays for itself in 18 months

 

作者:

 

期刊: Production Engineer  (IET Available online 1984)
卷期: Volume 63, issue 3  

页码: 38-38

 

年代: 1984

 

DOI:10.1049/tpe.1984.0055

 

出版商: IEE

 

数据来源: IET

 

摘要:

Simply by saving two salaries, the Micross production control system from Kewill Systems of Surrey has paid for itself since being installed 18 months ago at the Harrogate works of Brammer Dynamics. We look at the system's two key modules, at the Brammer application, and at another Micross installation.

 

点击下载:  PDF (744KB)



返 回